Take a tour of the studio and see the construction process from beginning to end. Mouse over the smaller pictures to get a larger view.



The building

The floor just poured

Walls complete in Studio 1

The foyer and part of student lounge from the 2nd floor

New tiles in the foyer

Walls complete in Studio 2

Sprung floor arrived and waiting to be installed

Foyer from 2nd floor, painted and tiled

Laying tile in 1st floor change room

1st floor change room, tile laid and benches in

2nd floor change room, a blank slate

2nd floor change room, tile laid and benches started

Upstairs hall between change room and studio

The border for the sprung dance floor

The dance floor tiles

Installing the foam base

Installing the floor in Studio 2

The subfloor laid is Studio 1

Progress in the Student Lounge

A funky place to hang out

Handpainting the logo

The studio mirrors installed

The lounge is complete

The directors at the open house